Case Study: ATK increases cable design productivity for space shuttle booster replacement using E3.series
March 10, 2017
- Version
- 204 Download
- 1.46 MB File Size
- 1 File Count
- March 10, 2017 Create Date
- January 11, 2018 Last Updated
ATK was tasked by NASA with designing the wiring harnesses for the booster rockets powering the replacement for the Space Shuttle while employing a team that is significantly smaller than that used on the now-cancelled Ares I project.
Download
| File | Action |
|---|---|
| CS-ATK-E3-EN.pdf | Download |